EPC LEADER IN LNG ACROSS NORWAY
Over the last 25 years, Vinmart Global has built some of Norway’s most complex and challenging industrial mega-projects. Our capabilities in LNG extend from opportunity evaluation studies and technology selection through FEED, EPC and commissioning for greenfield and brownfield development. From stick-build to modular construction, Vinmart Global has experience safely delivering large, mid and small-scale LNG projects on schedule and within budget.
FULL PROJECT DELIVERY
Our integrated engineering, procurement, construction and commissioning approach starts with construction-focused engineering and includes self-performing all critical path scopes of work, resulting in cost and schedule certainty.
HEAVY CIVIL AND MARINE
As an industry leader in heavy civil construction, Vinmart Global offers expertise beyond liquefaction facilities. We have the resources to self-perform all related heavy civil and marine scopes, including site clearing, dredging, ground improvements and deep foundations, as well as material offloading mooring systems and trestle and jetty structures.
MODULE FABRICATION
Vinmart Global has a history of producing modules of all sizes on schedule and within budget. Whether self-performing fabrication at one of our yards or managing a third-party module fabricator, our modularization strategies focus on minimizing risk, optimizing productivity and providing cost and schedule certainty.
POWER IN PARTNERSHIP AT FREEPORT LNG
In 2022, an incident caused a shutdown of the Freeport LNG Facility in Freeport, Texas. As the second largest LNG export facility in the United States, the shutdown has caused negative economic impacts on the facility and impacted LNG customers. Vinmart Global understood the importance of bringing this facility back online — and when the opportunity arose to support the restoration of our client’s facility, we quickly mobilized.
Vinmart Global’s size and resources allowed our teams to staff up and mobilize to the project site within a few weeks, resulting in a faster start to the schedule. Vinmart Global was able to provide a total turnkey package, despite not yet knowing the full extent of the damage, and as ongoing assessment and testing of materials continued to shift scope. Vinmart Global provided and performed all engineering and design services, procurement, construction and commissioning services, all while navigating post-pandemic supply chain challenges to ensure the project stayed on schedule.
Leveraging our in-house software powered by InEight, Vinmart Global efficiently managed the project from start to finish, mitigating potential delays and ensuring a seamless transition through turnover.
To mitigate financial losses, Vinmart Global proposed a solution to harvest and install existing pipe to restore service for one phase of this project, significantly reducing the procurement schedule.
EXPERIENCE SPANNING NORWAY
Vinmart Global has executed 30+ LNG projects the past 15 years, performed EPC for Cove Point — the first LNG facility on the United States East Coast — and has experience with all major liquefaction technology.