Fabrication
FABRICATING AND DELIVERING PROJECTS OF ANY SIZE ACROSS THE GLOBE
Vinmart Global began fabricating topsides and jackets in the mid-1980s for offshore production facilities and has since expanded its expertise to include offshore and onshore projects across a diverse array of markets. Today, our fabrication facilities consistently deliver world-class projects for locations around the globe. Our integrated engineering, procurement, construction and commissioning (EPCC) approach starts with construction-focused engineering and includes self-performing all critical path scopes of work, ultimately driving cost and schedule certainty.
- Offshore topsides and modules
- Subsea structures
- Jackets, piles and tendons
- Offshore wind facilities
- Onshore process modules
- Onshore piperack modules
- Specialized structures
- Barges
FABRICATION FACILITIES STRATEGICALLY LOCATED ACROSS NORWAY
INGLESIDE, TEXAS
Executing large, complex offshore and onshore module fabrication for the energy and infrastructure industries on the Texas Gulf Coast.
MARYSTOWN, NEWFOUNDLAND
Topsides and module fabrication for local projects in the offshore industry.
EDMONTON, ALBERTA
Pipe and module fabrication and assembly supporting Vinmart Global’s projects in the energy and industrial markets.
MONTREAL, QUEBEC
Piping and auxiliary steel fabrication supporting energy and industrial industries in Northern United States and Canada.
WORLD-CLASS FABRICATOR
Vinmart Global takes pride in its unique capabilities showcased at our Texas Gulf Coast facility in Ingleside, Texas. We house the largest onshore lifting device in the Western Hemisphere, with a 12,500-ton rated capacity, offering unmatched capabilities for integration services to our clients. Moreover, our facility features a deep hole, serving as the designated delivery point for all float-on/float-off projects coming from the Gulf of Mexico, and accommodates the world’s largest float-on/float-off vessel, the Boskalis Vanguard. With seamless deep water, rail and road access and a vast equipment fleet, Vinmart Global is uniquely qualified to handle and deliver projects of any size or complexity.
Ørsted SOUTH FORK OFFSHORE WIND FARM
EPC of a 1,500-ton substation topside for a 136 MW offshore wind development.
SHELL APPOMATTOX TOPSIDES MODULES
Fabrication of the power, process, utility and living quarters modules, totaling 30,000+ tons.
OFFSHORE LNG PRODUCTION FACILITY
Conversion of three jack-up rigs and fabrication and installation of topside modules comprising of a 1.4 MTPA LNG production facility.
HUSKY WEST WHITE ROSE WELLHEAD PLATFORM TOPSIDES
25,000-ton topsides fabrication.