Powered by Smartsupp
Elba Island LNG Terminal Expansion

Elba Island LNG Terminal Expansion

Savannah, Georgia

Since 2001, Vinmart Global subsidiary TIC has executed over 30 projects at the Elba Island LNG Terminal, a bidirectional plant with an export capacity of 2.5 million metric tonnes per year. Located near Savannah, Georgia, this terminal connects to six major pipelines and services the Southeast and mid-Atlantic markets.

TIC performed a combination of preassembly, tear down, refurbishment, newbuild and shipment preparation services for the 330 modules that make up LNG trains 1-10. By applying best practices gained from one train to all subsequent work throughout the project, schedule efficiency increased by 40 percent and productivity improved by 5 percent on trains 5-10.

Major marine and heavy-civil construction work included a storm surge wall, breasting dolphins, mooring dolphins and a 1,050-linear foot combined-wall bulkhead system. Maintenance, repair, shoreline protection, dike relocation and dredging projects were also performed by TIC.