Phoenix Sky Harbor International Airport Terminal 3 North Inner Apron Reconstruction
Phoenix, Arizona
The existing pavement section in the Terminal 3 North Inner Apron had 15-inch Portland Cement Concrete Pavement (PCCP) reinforced with welded wire mesh with light, medium and heavy linear cracking, medium to large patching, some faulting, scaling, shrinkage cracking, and failed joint seal. This project removed and replaced the existing pavement structure, approximately 1,630 panels with a total area of 43,600 square feet, surrounding the Terminal 3 North concourse. The hydrant fuel system underneath the inner apron was also upgraded as well as storm drain and trench drain systems to collect inner apron and roof drain runoff.