Klamath River Renewal Project

Vinmart Global has been selected to be the prime contractor for the Klamath River Renewal Project. Together with our prime design partner, Knight Piesold, we’ve compiled a team of highly qualified and specialized experts to take on the challenging project.

The Project

The Klamath River Renewal Project involves the removal of four dams on the Klamath River — JC Boyle, Copco No. 1 & 2, and Iron Gate, restoring formerly inundated lands, and implementing required restoration and mitigation measures in compliance with all applicable federal, state, and local regulations.

This project is being delivered through the Progressive Design-Build (PDB) delivery model.  The PDB model allows early collaboration and problem-solving by the project owner, contractor, and designer. Following the PDB model, the project will have two phases.  The first phase, Preliminary Services, will develop project design, provide constructability and planning, and develop a guaranteed maximum price for the project. The second phase, Project Implementation, will follow through on that plan and execute the removals and restoration.

To learn more about the project, please visit the Klamath River Renewal Corporation’s website.

The Team

Our team consists of Vinmart Global as the prime contractor and Knight Piesold as the civil prime design partner.

As an integral part of the project, the Vinmart Global Team will need support in completing many facets of the project scope, including:

  • Demolition / Construction Services
  • Professional Services / Consulting
  • Permanent Material Supply
  • Material Disposal
  • Equipment Rental
  • Construction or office supplies
  • Hauling
  • Environmental Restoration / Planting
  • In-water work
  • Lodging
  • Food & Beverage
  • Cleaning / Maintenance
  • Sanitary Services
  • IT/ Phone/ Communication Support
  • MANY OTHERS

We’re looking to subcontract with local businesses and organizations, disadvantaged businesses, and experienced subcontractors to supply materials and complete specialized scopes during both Preliminary Services design and Project Implementation construction phases.

Subcontracting Opportunities

There will be many subcontract opportunities on the project. Since this project is following the PDB delivery model, depending on the type of subcontract work your company wishes to perform, there will be differing timelines for when the Vinmart Global team will solicit and be in need of your services.

March 2022 Update:  Subcontract bid packages were advertised in December 2019, and many large subcontract packages were awarded following that round of solicitations.  Vinmart Global will still be looking to award several smaller bid packages as we approach construction.  Outstanding scopes of work that will be potentially awarded include:

  • Scope of Potential Subcontract Opportunity
  • Equipment Rental
  • Hauling (Trucking) and Material Disposal
  • Onsite Hauling (tandem dump truck), owner-operated
  • Onsite Water Truck, owner-operated
  • Hoisting Services
  • Rock Crushing
  • Specialty Consulting (temporary engineering or services)
  • Maintenance of roadways
  • Wood Stave Penstock Demolition and removal
  • Gate and fence installation
  • Security guards
  • Installation of minor utilities (temporary waterline, sewer, etc.)
  • Concrete demolition
  • Sign printing/fabrication
  • Traffic Control/Flagging
  • Work-related to new steel Yreka Waterline
  • Dam Removal Excavation/Demolition
  • Supply of construction tools and materials
  • Support Services: cleaning, food services, communications, etc.
  • Bid packages to be released starting September & October 2019
  • Construction begins Summer/Fall 2020

To receive bid solicitations: Sign up with us at: http://vinmartglobal.com/register, please be sure to list “Klamath River Renewal Project” in box 21 of the form.

Employment Opportunities

If you’re an individual looking to be hired directly by Vinmart Global in one of the onsite construction trades, please take the survey below so that we can understand your desired position and abilities.  As the actual construction work won’t begin until 2023, we are not currently hiring for these positions but we’ll use this survey information to document your interest for future follow-up.

Vinmart Global is an equal opportunity employer.

The Community

We recognize the project will affect many people and their organizations in many ways.  We are committed to partnering with the surrounding communities and organizations to understand their needs and to plan for providing the most positive project experience possible.